大规模集群可再生能源有功分层协调控制策略Active Power Stratification Coordination Control Strategy for Large-Scale Cluster of Renewable Energy
施贵荣;孙荣富;徐海翔;乔颖;
摘要(Abstract):
随着可再生能源占比不断攀升,可再生能源安全问题和消纳问题日益凸显,提高可再生能源有功控制能力十分关键。因此,针对高占比可再生能源接入电网带来的新特征,提出了大规模集群可再生能源有功分层协调控制策略,涵盖调峰控制、调频控制、断面控制、市场交易和风光协调模式,协调优化系统运行安全性、消纳经济性和控制公平性。所提策略动态评估全网乃至各断面可再生能源最大消纳能力,确保电网安全运行;按照全网层、场群层、场站层顺序逐层优化有功控制指令,拓展可再生能源消纳深度和广度;针对性配置合理有功分配权重系数,保障不同可再生能源场站群、同断面风光发电之间消纳公平。冀北电网的实际运行情况证明了文中所提可再生能源控制策略的有效性。
关键词(KeyWords): 可再生能源;有功控制;调峰约束;断面约束;电力市场
基金项目(Foundation): 国家自然科学基金面上项目(51677099);; 国网冀北电力有限国家电网公司科技项目“新能源消纳能力评估及关键影响因素分析~~
作者(Author): 施贵荣;孙荣富;徐海翔;乔颖;
Email:
DOI: 10.13335/j.1000-3673.pst.2018.0180
参考文献(References):
- [1]薛禹胜,雷兴,薛峰,等.关于风电不确定性对电力系统影响的评述[J].中国电机工程学报,2014,34(29):29-40.Xue Yusheng,Lei Xing,Xue Feng,et al.A review on impacts of wind power uncertainties on power systems[J].Proceedings of the CSEE,2014,34(29):29-40(in Chinese).
- [2]Holttinen H,Meibom P,Orths A,et al.Impacts of large amounts of wind power on design and operation of power systems,results of IEA collaboration[J].Wind Energy,2011,14(2):179-192.
- [3]孙荣富,王东升,丁华杰,等.风电消纳全生产过程评价方法[J].电网技术,2017,41(9):2777-2783.Sun Rongfu,Wang Dongsheng,Ding Huajie,et al.Whole-process evaluation methods of wind power accommodation[J].Power System Technology,2017,41(9):2777-2783(in Chinese).
- [4]金维刚,李勇,印永华,等.不确定环境下特高压远距离风电专用通道落点方案决策的灵敏度分析[J].电网技术,2016,40(3):889-896.Jin Weigang,Li Yong,Yin Yonghua,et al.Sensitivity analysis for decision-making of UHV long distance power transmission site selection under uncertainty based on cloud model[J].Power System Technology,2016,40(3):889-896(in Chinese).
- [5]甘磊,谷纪亭,钟宇军,等.考虑多形态间歇性电源集中接入的输电网随机双层规划方法[J].电网技术,2016,40(10):3125-3131.Gan Lei,Gu Jiting,Zhong Yujun,et al.Bi-level stochastic planning method of transmission networks with multiple centralized intermittent generations[J].Power System Technology,2016,40(10):3125-3131(in Chinese).
- [6]竺炜,蒋银华,刘长富,等.风功率波动下的电网在线安全和经济调度方法[J].电网技术,2016,40(11):3511-3516.Zhu Wei,Jiang Yinhua,Liu Changfu,et al.On-line dispatching method of security and economic under wind power fluctuations[J].Power System Technology,2016,40(11):3511-3516(in Chinese).
- [7]黎静华,左俊军,汪赛.大规模风电并网电力系统运行风险评估与分析[J].电网技术,2016,40(11):3503-3510.Li Jinghua,Zuo Junjun,Wang Sai.Analysis and assessment of operation risk for power system with large-scale wind power integration[J].Power System Technology,2016,40(11):3503-3510(in Chinese).
- [8]汤奕,王琦,陈宁,等.采用功率预测信息的风电场有功优化控制方法[J].中国电机工程学报,2012,32(34):1-7.Tang Yi,Wang Qi,Chen Ning,et al.An optimal active power control method of wind farm based on wind power forecasting information[J].Proceedings of the CSEE,2012,32(34):1-7(in Chinese).
- [9]王魁,张步涵,闫大威,等.含大规模风电的电力系统多时间尺度滚动协调调度方法研究[J].电网技术,2014,38(9):2434-2440.Wang Kui,Zhang Buhan,Yan Dawei,et al.A multi-time scale rolling coordination scheduling method for power grid integrated with large scale wind farm[J].Power System Technology,2014,38(9):2434-2440(in Chinese).
- [10]行舟,陈永华,陈振寰,等.大型集群风电有功智能控制系统控制策-风电场之间的协调控制[J].电力系统自动化,2011,35(20):20-23.Xing Zhou,Chen Yonghua,Chen Zhenhuan,et al.A control strategy of active power intelligent control system for large cluster of wind farms,coordination control for wind farms[J].Automation of Electric Power Systems,2011,35(20):20-23(in Chinese).
- [11]邹云阳,杨莉.大基于经典场景集的风光水虚拟电厂协同调度模型[J].电网技术,2015,39(7):1855-1859.Zou Yunyang,Yang Li.Synergetic dispatch models of a Wind/PV/Hydro virtual power plant based on representative scenario set[J].Power System Technology,2015,39(7):1855-1859(in Chinese).
- [12]陈振寰,陈永华,行舟,等.大型集群风电有功智能控制系统控制策-风火电打捆外送协调控制[J].电力系统自动化,2011,35(21):12-15.Chen Zhenhuan,Chen Yonghua,Xing Zhou,et al.A control strategy of active power intelligent control system for large cluster of wind farms,Coordination control for shared transmission of wind power and thermal power[J].Automation of Electric Power Systems,2011,35(21):12-15(in Chinese).
- [13]郑太一,范国英,孙勇,等.大规模风电接入电网多目标电源的协调控制[J].电网技术,2013,37(11):3091-3095.Zheng Taiyi,Fan Guoying,Sun Yong,et al.A coordinated control strategy for multiple power sources under grid-integration of largeScale wind farm[J].Power System Technology,2013,37(11):3091-3095(in Chinese).
- [14]林俐,谢永俊,朱晨宸,等.基于优先顺序法的风电场限出力有功控制策略[J].电网技术,2013,37(4):960-966.Lin Li,Xie Yongjun,Zhu Chenchen,et al.Priority list-based output-restricted active power control strategy for wind farms[J].Power System Technology,2013,37(4):960-966(in Chinese).
- [15]Pappala V S,Erlich I,Rohrig K,et al.A stochastic model for the optimal operation of a wind-thermal power system[J].IEEE Transactions on Power Systems,2009,24(2):940-950.
- [16]乔颖,鲁宗相.考虑电网约束的风电场自动有功控制[J].电力系统自动化,2009,33(22):88-93.Qiao Ying,Lu Zongxiang.Wind farms active power control considering constraints of power grids[J].Automation of Electric Power Systems,2009,33(22):88-93(in Chinese).
- [17]王靖然,王玉林,杨志刚,等.考虑嵌套断面约束的大规模集群风电有功控制策略[J].电力系统自动化,2015,39(13):16-21.Wang Jingran,Wang Yulin,Yang Zhigang,et al.An active power control strategy for large-scale cluster of wind power considering constraints on nested transmission sections[J].Automation of Electric Power Systems,2015,39(13):16-21(in Chinese).
- [18]卓峻峰,金学洙,邓波,等.考虑断面安全约束的大规模风电有功控制[J].电网技术,2015,39(4):1014-1018.Zhuo Junfeng,Jin Xuezhu,Deng Bo,et al.An active power control method of large-scale wind farm considering security constraints of tie lines[J].Power System Technology,2015,39(4):1014-1018(in Chinese).
- [19]谢旭,吴继平,罗亚洲,等.同一控制区两级调度风电实时协调控制策略[J].电力系统自动化,2017,41(11):114-119.Xie Xu,Wu Jiping,Luo Yazhou,et al.Real-time coordinated control strategy for wind power with two-level dispatching in same control area[J].Automation of Electric Power Systems,2017,41(11):114-119(in Chinese).