摘要(Abstract):
分析了直线形、星形和圆环形3种常见水平接地极的特点,结合溪洛渡、向家坝直流换流站初选东阳和万寿极址的地形资料,对标准3圆环接地极的环径比例选择、各子圆环的埋深特性及采用该电极型式的可行性进行了分析研究。模拟计算表明:溪洛渡换流站接地极应优先考虑3圆环接地极型式,当其环径比例为0.7、布置型式采用同心非等深布置时,东阳极址在额定条件下可满足系统运行要求,且可获得较高的安全裕量;对于万寿极址,标准3圆环电极不能满足系统运行要求,如采用跑道式环形电极,则经济性很差,因此不宜作为换流站接地极址。
关键词(KeyWords): 特高压直流输电;直线电极;星型电极;圆环电极;埋深;绝缘
基金项目(Foundation):
作者(Author): 崔明德;刘连光;孙中明;
Email:
DOI:
参考文献(References):
- [1]吴桂芳.我国±500 kV直流输电工程的电磁环境问题[J].电网技术,2005,29(11):5-8.Wu Guifang.Electromagnetic environment problem brought about by±500kV DC transmission project in China[J].Power System Technology,2005,29(11):5-8(in Chinese).
- [2]梁明.溪洛渡、向家坝水电站送出工程相关问题探讨[R].北京:国家电网公司,2005.
- [3]孙勇.深井排流体的电流场计算与分析[D].上海:上海交通大学,2003.
- [4]赵畹君.高压直流输电工程技术[M].北京:中国电力出版社,2004.
- [5]徐淑珍,朱子述.芦潮港—嵊泗直流工程预选极址的接地极计算和分析[J].上海交通大学学报,1999,33(12):1493-1497.Xu Shuzhen,Zhu Zishu.Calculation and analysis on buried electrode in Luchaogang-Shanghai HVDC project[J].Journal of Shanghai Jiaotong University,1999,33(12):1493-1497(in Chinese).
- [6]Wang Jianwu,Wen Xishan,Du Zhongdong,et al.Technical and economic performance analysis on vertical grounding electrodes of±800 kV UHVDC[C].2006 China International Conference on Electricity Distribution,Beijing,China,2006.
- [7]国家电网公司.金沙江一期送电工程溪洛渡—浙西800 kV直流输电工程送端接地极及接地极线路报告[R].北京:国家电网公司,2005.
- [8]国家电网公司.金沙江一期送电工程溪洛渡至湖南输变电工程规划选站、选线阶段青口、株洲直流换流站接地极及接地极线路选址、选线报告[R].北京:国家电网公司,2005.
- [9]国家电网公司.金沙江一期送电工程向家坝—上海800 kV直流输电工程可行性研究向家坝送端接地极及接地极线路报告[R].北京:国家电网公司,2005.
- [10]Ruan W,Ma J,Liu J,et al.Performance of HVDC ground electrode in various soil structures[C].Proceedings of 2002 International Conference on Power System Technology,Kunming,2002:962-968.
- [11]Ma J X,Dawalibi R P,Ruan W.Design considerations of HVDC grounding electrodes[J].IEEE/PES Transmission and Distribution and Exhibition:Asia and Pacific,2005:1-6.
- [12]阮江军.直线型直流接地极附近三维电流场边界元法计算[J].高电压技术,1997,23(3):49-51.Ruan Jiangjun.3D Current field computation around linear-type HVDC ground electrodes with BEM method[J].High Voltage Engineering,1997,23(3):49-51(in Chinese).
- [13]林启文,钱之银.延长葛上±500 kV直流接地极运行寿命的方法—合理布置引流棒[J].高电压技术,1998,24(1):76-78.Lin Qiwen,Qian Zhiyin.The method of extending service life of DC ground electrode of±500 kV Gezhouba-Shanghai HVDC transmission rationally arranging feeder steels[J].High Voltage Engineering,1998,24(1):76-78(in Chinese).
- [14]曹林,赵杰,张波,等.高压直流输电直线型接地极系统分析[J].高电压技术,2006,32(2):92-94.Cao Lin,Zhao Jie,Zhang Bo,et al.Analysis of HVDC linear ground electrode system[J].High Voltage Engineering,2006,32(2):92-94(in Chinese).
- [15]解广润.电力系统接地极技术[M].北京:中国电力出版社,1996.
- [16]DL/T 5224-2005,高压直流输电大地返回运行系统设计技术规定[S].
- [17]舒印彪,刘泽洪,高理迎,等.±800kV 6400MW特高压直流输电工程设计[J].电网技术,2006,30(1):1-8.Shu Yinbiao,Liu Zehong,Gao Liying,et al.A preliminary exploration for design of±800kV UHVDC project with transmission capacity of 6400MW[J].Power System Technology,2006,30(1):1-8(in Chinese).
- [18]严宇,朱伟江,刘皓,等.葛南直流输电系统中大地回线和金属回线转换的研究[J].电网技术,2005,29(21):1-4.Yan Yu,Zhu Weijiang,Liu Hao,et al.Research on transition between ground return and metal return in Gezhouba-Nanqiao HVDC transmission system[J].Power System Technology,2005,29(21):1-4(in Chinese).