适应不同优化模型的水电梯级系统短期调度算法Short-term Scheduling Algorithm of Hydropower Cascade System Adapted to Different Optimization Models
张高峰;郑浩;刘双全;王金文;
摘要(Abstract):
短期水电系统的发电优化调度是非线性离散优化问题。随着水电系统规模的增大,该问题的求解也变得更加困难。结合考虑约束条件的优先级别,建立了适应弃水量最小、发电效益/电量最大、调峰电量最大和发电趋势吻合4个调度目标的数学模型,采用分级求解结合局部搜索的方法解决大规模水电系统短期联合优化调度问题。通过在包含45个水库的水电系统优化调度中的应用,并比较不同目标下优化结果的差异,结果表明了上述模型和方法的有效性。
关键词(KeyWords): 水库梯级;水电系统;短期调度;优化;发电趋势吻合
基金项目(Foundation): 国家重点研发计划项目(2016YFC0401910)~~
作者(Author): 张高峰;郑浩;刘双全;王金文;
Email:
DOI: 10.13335/j.1000-3673.pst.2019.0071
参考文献(References):
- [1]程春田,武新宇,申建建,等.大规模水电站群短期优化调度方法I:总体概述[J].水利学报,2011,42(9):1017-1024.Cheng Chuntian,Wu Xinyu,Shen Jianjian,et al.Short-term optimal operation methods of large-scale hydropower plants I-General overview[J].Journal of Hydraulic Engineering,2011,42(9):1011-1024(in Chinese).
- [2]卢鹏,周建中,莫莉,等.梯级水电站群多电网调峰调度及电力跨省区协调分配方法[J].电网技术,2016,40(9):2721-2728.Lu Peng,Zhou Jianzhong,Mo Li,et al.Method of peak operation and electric power inter-provincial coordinated distribution for cascade hydropower plants among multiple power grids[J].Power System Technology,2016,40(9):2721-2728(in Chinese).
- [3]贾江涛,管晓宏,翟桥柱.考虑水头影响的梯级水电站群短期优化调度[J].电力系统自动化,2009,33(13):13-16.Jia Jiangtao,Guan Xiaohong,Zhai Qiaozhu.Short-term optimal scheduling of head-dependent cascaded hydropower stations[J].Automation of Electric Power Systems,2009,33(13):13-16(in Chinese).
- [4]唐海华,陈森林,赵宇.三峡梯级电站短期优化调度模型及算法[J].水电能源科学,2008,26(3):133-36.Tang Haihua,Chen Senlin,Zhao Yu.Model and algorithm of shortterm optimal scheduling of Three Gorges cascaded hydropower stations[J].Water Resources and Power,2008,26(3):133-136(in Chinese).
- [5]李彩林.水电站中长期优化调度与风险研究[D].武汉:华中科技大学,2007.
- [6] Naccarino J,Cheung R,Briggs W,et al.Real-time monitoring optimization and control of a hydroelectric complex[J]. IEEE Transactions on Power Systems,1988,3(4):1769-1783.
- [7]许惠君.基于改进粒子群算法的水电站中长期优化调度的研究[J].科技资讯,2013(28):91-92.Xu Huijun.Based on improved particle swarm algorithm to the study of the medium and long-term optimal scheduling[J].Science&Technology Information.2013(28):91-92(in Chinese).
- [8]代奇迹,毛先胤.梯级水电站短期优化调度方法综述[J].贵州电力技术,2016,19(8):13-17.Dai Qiji,Mao Xianyin.Methods of cascade hydropower short-term optimization scheduling[J].Guizhou Electric Power Technology.2016,19(8):13-17(in Chinese).
- [9]吴杰康,郭壮志,秦砺寒,等.基于连续线性规划的梯级水电站优化调度[J].电网技术,2009,33(8):24-29.Wu Jiekang,Guo Zhuangzhi,Qin Lihan,et al.Successive linear programming based optimal scheduling of cascade hydropower station[J].Power System Technology,2009,33(8):24-29(in Chinese).
- [10]贾嵘,李阳,丁建河,等.改进遗传算法在水电站日优化运行模型中的应用[J].电网技术,2005,29(14):77-80.Jia Rong,Li Yang,Ding Jianhe,et al.Application of improved genetic algorithm in daily optimal operation model for hydropower stations[J].Power System Technology,2005,29(14):77-80(in Chinese).
- [11]刘攀,郭生练,李玮,等.遗传算法在水库调度中的应用综述[J].水利水电科技进展,2006,26(4):78-83.Liu Pan,Guo Shenglian,Li Wei,et al.A review of application of genetic algorithm to reservoir operation[J].Advances in Science and Technology of Water Resources,2006,26(4):78-83(in Chinese).
- [12]王金文,刘双全.短期水电系统发电调度的优化方法综述[J].水电能源科学,2008,26(6):137-143.Wang Jinwen,Liu Shuangquan.Optimization techniques in short-term hydropower scheduling:a state-of-art review[J].Water Resources and Power,2008,26(6):137-143(in Chinese).
- [13]刘双全,张海龙.水电优化调度算法研究综述[J].云南电力技术,2011,39(4):5-9.Liu Shuangquan, Zhang Hailong. A review of hydropower optimization scheduling algorithms[J].Yunnan Electric Power,2011,39(4):5-9(in Chinese).
- [14]王森,马志鹏,李善综,等.梯级水库群优化调度并行动态规划方法[J].中国农村水利水电,2017(11):204-207.Wang Sen,Ma Zhipeng,Li Shanzong,et al.Parallel dynamic programming for the optimal operation of cascaded reservoirs[J].China Rural Water and Hydropower,2017(11):204-207(in Chinese).
- [15]王颖,周刚,韩红卫,等.计及风电最优置信度的机组组合优化方法[J].电网技术,2017,41(3):808-815.Wang Ying,Zhou Gang,Han Hongwei,et al.Unit commitment considering optimal confidence of wind power uncertainty[J].Power System Technology,2017,41(3):808-815(in Chinese).
- [16]贾江涛.一种带抽蓄机组水电系统短期优化调度方法[J].电网技术,2017,41(5):1597-1602.Jia Jiangtao. An optimal method of short-term scheduling for hydropower system with pumped-storage units[J].Power System Technology,2017,41(5):1597-1602(in Chinese).
- [17]苏承国,王沛霖,武新宇,等.考虑机组组合的梯级水电站短期调峰MILP模型[J].电网技术,2018,42(6):1883-1891.Su Chengguo,Wang Peilin,Wu Xinyu,et al.A compact MILP model for short-term peak shaving of cascaded hydropower plants considering unit commitment[J].Power System Technology,2018,42(6):1883-1891(in Chinese).
- [18] Wang J, Guo M, Liu Y. Hydropower unit commitment with nonlinearity decoupled from mixed integer nonlinear problem[J].Energy,2018,150:839-846.
- [19] Barros M,Tsai F,Yang S L,et al.Optimization of large scale hydropower system operations[J]. Journal of Water Resources Planning and Management,2003,129(3):178-188.
- [20] Wang J,Liu S,Zhang Y.Quarter-hourly operation of large-scale hydropower reservoir systems with prioritized constraints[J].Journal of Water Resources Planning and Management,2015.141(1):04014047.
- [21]王金文,石琦,伍永刚,等.水电系统长期发电优化调度模型及其求解[J].电力系统自动化,2002,26(24):22-25+30.Wang Jinwen,Shi Qi,Wu Yonggang,et al.Long-term optimal generation scheduling for the energy maximization of hydropower systems[J].Automation of Electric Power Systems,2002,26(24):22-25+30(in Chinese).