为应对风电场出力波动及电网故障给安全约束优化潮流带来的问题,在优化潮流中考虑校正控制,选择输电线路N-1故障及多风电场出力波动的组合作为电网运行的预想事件,在风电功率区间预测基础上得出相应置信水平的风电场出力上下限,并采用极限场景以代替风电功率预测误差的多种情况,通过基于关键输电断面的预想事件筛选以及主问题和多重子问题划分,经交替迭代求解最后可得到满足正常状态经济性及预想事件下安全约束的发电计划。IEEE 30节点系统的仿真结果验证了该方法的有效性。
关键词(KeyWords): 安全约束优化潮流;校正控制;风电;区间预测
基金项目(Foundation): 甘肃省电力公司的项目资助(11H1407)
作者(Author): 江东林;徐向东;刘天琪;陈振寰;王福军;李晓虎;尹专;
Email:
DOI: 10.13335/j.1000-3673.pst.2013.01.030
参考文献(References):
- [1]迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impactof wind power integration on power system[J].Power SystemTechnology,2007,31(3):77-81(in Chinese).
- [2]王锐,顾伟,孙蓉,等.基于概率最优潮流的风电接入能力分析[J].电网技术,2011,35(12):214-220.Wang Rui,Gu Wei,Sun Rong,et al.Analysis on wind powerpenetration limit based on probabilistically optimal power flow[J].Power System Technology,2011,35(12):214-220(in Chinese).
- [3]雷亚洲,王伟胜,印永华,等.含风电场电力系统的有功优化潮流[J].电网技术,2002,26(6):18-21.Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Optimal real powerflow in wind power integrated system[J].Power System Technology,2002,26(6):18-21(in Chinese).
- [4]Monticelli A,Pereira M V F,Granville S.Security-constrainedoptimal power flow with post-contingency corrective rescheduling[J].IEEE Trans on Power Systems,1987,2(1):175-180.
- [5]Capitanescu F,Wehenkel L.A new iterative approach to thecorrective security-constrained optimal power flow[J].IEEE Trans onPower Systems,2008,23(4):1533-1541.
- [6]Capitanescu F,Wehenkel L.Improving the statement of the correctivesecurity-constrained optimal power-flow problem[J].IEEE Trans onPower Systems,2007,22(2):887-889.
- [7]Alsac O,Stott B.Optimal load flow with steady-state security[J].IEEE Trans on Power Systems,1974,PAS-93(3):745-751.
- [8]王彩霞,鲁宗相.风电功率预测信息在日前机组组合中的应用[J].电力系统自动化,2011,35(7):13-18.Wang Caixia,Lu Zongxiang.Unit commitment based on wind powerforecast[J].Automation of Electric Power Systems,2011,35(7):13-18(in Chinese).
- [9]Pierre P,Kariniotakis G.Conditional prediction intervals of windpower generation[J].IEEE Trans on Power Systems,2010,25(4):1845-1846.
- [10]Pinson P,Kariniotakis G.On-line assessment of prediction risk forwind power production forecasts[J].Wind Energy,2004,7(2):119-132.
- [11]无喜之,王兆军.非参数统计方法[M].北京:高等教育出版社,1996:140-148.
- [12]Ummels B C,Gibescu M,Pelgrum E,et al.Impacts of wind poweron thermal generation unit commitment and dispatch[J].IEEE Transon Energy Conversion,2007,22(1):44-51.
- [13]周玮,彭昱,孙辉,等.含风电场的电力系统动态经济调度[J].中国电机工程学报,2009,29(25):13-18.Zhou Wei,Peng Yu,Sun Hui,et al.Dynamic economic dispatch inwind power integrated system[J].Proceedings of the CSEE,2009,29(25):13-18(in Chinese).
- [14]苏鹏,刘天琪,李兴源.含风电的系统最优旋转备用的确定[J].电网技术,2010,34(12):158-162.Su Peng,Liu Tianqi,Li Xingyuan.Determination of optimal spinningreserve of power grid containing wind[J].Power System Technology,2010,34(12):158-162(in Chinese).
- [15]艾欣,刘晓,孙翠英.含风电场电力系统机组组合的模糊机会约束决策模型[J].电网技术,2011,35(12):202-207.Ai Xin,Liu Xiao,Sun Cuiying.A fuzzy chance constrained decisionmodel for unit commitment of power grid containing large-scale windfarm[J].Power System Technology,2011,35(12):202-207(inChinese).
- [16]沈瑜,夏清,康重庆.发电联合转移分布因子及快速静态安全校核算法[J].电力系统自动化,2003,27(18):13-17.Shen Yu,Xia Qing,Kang Chongqing.Generation jointly shiftdistribution factor(GJSDF)and fast security analysis algorithm ineconomic dispatch[J].Automation of Electric Power Systems,2003,27(18):13-17(in Chinese).
- [17]沈瑜.安全与经济相协调的电力市场交易理论的研究[D].北京:清华大学,2000.
- [18]李文沅.电力系统安全经济运行:模型与方法[M].重庆:重庆大学出版社,1989:48-66.
- [19]周德才,张保会,姚峰,等.基于图论的输电断面快速搜索[J].中国电机工程学报,2006,26(12):32-38.Zhou Decai,Zhang Baohui,Yao Feng,et al.Fast search fortransmission section based on graph theory[J].Proceedings of theCSEE,2006,26(12):32-38(in Chinese).