含分布式电源的配电网日前两阶段优化调度模型A Day-Ahead Two-Stage Optimal Scheduling Model for Distribution Network Containing Distributed Generations
孟晓丽;高君;盛万兴;顾伟;朱俊澎;范文飞;
摘要(Abstract):
在电力市场环境下,供电公司通过对接入配电网的分布式电源(distributed generation,DG)的优化调度,能够有效地降低其运行成本,规避市场竞争环境下的风险。提出了一种电力市场环境下供电公司日前优化调度的2阶段模型:第1阶段为DG优化调度阶段,根据市场电价、DG运行成本、签订可中断负荷(interruptable load,IL)合同的价格来确定DG的机组组合、从大电网的购电量及IL削减量;第2阶段为无功优化阶段,在第1阶段的基础上,考虑DG的无功出力特性,通过优化DG和无功补偿装置的出力调节电压使其在规定的范围内且配电网的网损最小。通过基于修改的IEEE 33节点系统的仿真计算,表明所提出的日前2阶段优化调度模型能够有效降低供电公司的运行成本。
关键词(KeyWords): 电力市场;分布式电源;机组组合;可中断负荷;无功补偿;配电网
基金项目(Foundation): 国家863高技术基金项目(2011AA05A107);; 国家自然科学基金项目(51477029);; 国家电网公司科技项目(PD71-13-031)~~
作者(Author): 孟晓丽;高君;盛万兴;顾伟;朱俊澎;范文飞;
Email:
DOI: 10.13335/j.1000-3673.pst.2015.05.019
参考文献(References):
- [1]李春华,王钦,文福拴.基于机会约束规划的供电公司最优购电策略[J].电力系统及其自动化学报,2007,19(6):12-17.Li Chunhua,Wang Qin,Wen Fushuan.Chance-constrained programming based approach to optimal purchasing strategies of distribution companies[J].Proceedings of the CSU-EPSA,2007,19(6):12-17(in Chinese).
- [2]裴玮,盛鹍,孔力,等.分布式电源对配网供电电压质量的影响与改善[J].中国电机工程学报,2008,28(13):152-157.Pei Wei,Sheng Kun,Kong Li,et al.Impact and improvement of distributed generation on distribution network voltage quality[J].Proceedings of the CSEE,2008,28(13):152-157(in Chinese).
- [3]田洪迅,袁蓉,赵渊.含分布式电源的配网可靠性概率计算[J].电网技术,2013,37(6):1562-1569.Tian Hongxun,Yuan Rong,Zhao Yuan,et al.Computation of probability distribution for reliability indices of distribution system containing distributed generation[J].Power System Technology,2013,37(6):1562-1569(in Chinese).
- [4]刘健,林涛,同向前,等.分布式光伏电源对配电网短路电流影响的仿真分析[J].电网技术,2013,37(8):2080-2085.Liu Jian,Lin Tao,Tong Xiangqian,et al.Simulation analysis on influences of distributed photovoltaic generation on short-circuit current in distribution network[J].Power System Technology,2013,37(8):2080-2085(in Chinese).
- [5]栗然,申雪,钟超,等.考虑环境效益的分布式电源多目标规划[J].电网技术,2014,38(6):1471-1478.Li Ran,Shen Xue,Zhong Chao,et al.Multi-objective planning of distributed generation considering environmental benefit[J].Power System Technology,2014,38(6):1471-1478(in Chinese).
- [6]曾鸣,杜楠,张鲲,等.基于多目标静态模糊模型的分布式电源规划[J].电网技术,2013,37(4):954-959.Zeng Ming,Du Nan,Zhang Kun,et al.Distributed generation planning based on multi-objective static fuzzy model[J].Power System Technology,2013,37(4):954-959(in Chinese).
- [7]张立梅,唐巍,王少林,等.综合考虑配电公司及独立发电商利益的分布式电源规划[J].电力系统自动化,2011,35(4):23-28.Zhang Limei,Tang Wei,Wang Shaolin,et al.Distributed generators planning considering benefits for distribution power company and independent power suppliers[J].Automation of Electric Power Systems,2011,35(4):23-28(in Chinese).
- [8]Algarni A,Bhattacharya K.A generic operations framework for discos in retail electricity markets[J].IEEE Transactions on Power Systems,2009,24(1):356-367.
- [9]Ghadikolaei H M,Tajik E,Aghaei J,et al.Integrated day-ahead and hour-ahead operation model of discos in retail electricity markets considering DGs and CO2 emission penalty cost[J].Applied Energy,2012,95(7):174-185.
- [10]Borghetti A,Bosetti M,Grillo S.Short-term scheduling and control of active distribution system with high penetration of renewable resources[J].IEEE Systems Journal,2010,4(3):313-322.
- [11]Goudarzi H,Hatami S,Pedram M.Demand-side load scheduling incentivized by dynamic energy prices[C]//Smart Grid Communications.Brussels,Belgium:IEEE,2011:351-356.
- [12]Gatsis N,Giannakis G.Residential load control:distributed scheduling and convergence with lost AMI messages[J].IEEE Transactions on Smart Grid,2012,3(2):770-786.
- [13]Mohsenian-Rad A,Wong V,Jatskevich J,et al.Autonomous demand-side management based on game-theoretic energy consumption scheduling for the future smart grid[J].IEEE Transactions on Smart Grid,2010,1(3):320-331.
- [14]Shinwari M,Youssef A,Hamouda W.A water-filling based scheduling algorithm for the smart grid[J].Transactions on Smart Grid,2012,3(2):710-719.
- [15]Salinas S,Li M,Li P.Multi-objective optimal energy consumption scheduling in smart grids[J].Transactions on Smart Grid,2013,4(1):341-348.
- [16]Neely M,Tehrani A,Dimakis A.Efficient algorithms for renewable energy allocation to delay tolerant consumers[C]//Smart Grid Communications.Los Angeles,CA,USA:IEEE,2010:549-554.
- [17]Urgaonkar R,Urgaonkar B,Neely M J,et al.Optimal power cost management using stored energy in data centers[C]//ACM SIGMETRICS.San Jose,USA:ACM,2011:1-12.
- [18]El-Zonkoly A,Saad M,Khalil R.Optimal intentional islanding of distribution systems with DG using CLPSO[C]//Electrotechnical Conference.Yasmine Hammamet,Tunisia:IEEE,2012:540-543.
- [19]Doostizadeh M,Ghasemi H.Day-ahead scheduling of an active distribution network considering energy and reserve markets[J].International Transactions on Electrical Energy Systems,2013,23(7):930-945.
- [20]Carrion M,Arroyo J.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Transactions on Power Systems,2006,21(3):1371-1378.
- [21]谢国辉,张粒子,舒隽,等.火电机组日前节能发电调度机组组合[J].电力系统及其自动化学报,2011,23(2):122-126.Xie Guohui,Zhang Lizi,Shu Jun,et al.Research on coal-fired unit commitment of day-ahead energy-saving generation dispatching[J].Proceedings of the CSU-EPSA,2011,23(2):122-126(in Chinese).
- [22]Braun M.Reactive power supply by distributed generators[C]//2008IEEE Power and Energy Society General Meeting.Pittsburgh,USA:IEEE,2008:1-8.
- [23]张丽,徐玉琴,王增平,等.包含分布式电源的配电网无功优化[J].电工技术学报,2011,26(3):168-174.Zhan Li,Xu Yuqin,Wang Zengping,et al.Reactive power optimization for distribution system with distributed generators[J].Transactions of China Electrotechnical Society,2011,26(3):168-174(in Chinese).
- [24]李晶,王素华,谷彩连.基于遗传算法的含分布式发电的配电网无功优化控制研究[J].电力系统保护与控制,2010,38(6):60-63.Li Jing,Wang Suhua,Gu Cailian.Research of reactive power optimization control in distribution networks based on genetic algorithm[J].Power System Protection and Control,2010,38(6):60-63(in Chinese).
- [25]朱文轩.基于PSO算法的含DG配电网无功优化研究[D].成都:西南交通大学,2013.
- [26]杨旭英,段建东,杨文宇,等.含分布式发电的配电网潮流计算[J].电网技术,2009,33(18):140-143.Yang Xuying,Duan Jiandong,Yang Wenyu,et al.Power flow calculation based on power losses sensitivity for distribution system with distributed generation[J].Power System Technology,2009,33(18):140-143(in Chinese).