辅助服务市场中集成商的资源集成投标策略Bidding Strategy of Resource Integration for Aggregator in Ancillary Service Market
张粒子;杨萌;梁伟;车权;李伟;李昭炯;
摘要(Abstract):
集成商组织需求侧资源参与辅助服务市场,既需要根据市场情况决策投标容量,又需要根据不同需求侧资源的技术经济特性优化组合。为发挥需求侧资源组合灵活的优势,在分析了需求侧资源技术经济特点的基础上,提出了集成商的资源集成投标策略。该策略一方面考虑了参加不同类型辅助服务市场投标容量的决策;另一方面考虑不同性能的需求侧资源的集成成本对投标决策的影响,引入条件概率约束,实现高可用性等效资源的最优组合。最后,通过某集成商对冬夏两季日前24小时的3种备用服务的投标决策算例,验证了该模型的有效性。
关键词(KeyWords): 辅助服务;集成商;虚拟电厂;机会约束规划
基金项目(Foundation): “2018渝电科技36#”项目的资助
作者(Author): 张粒子;杨萌;梁伟;车权;李伟;李昭炯;
Email:
DOI: 10.13335/j.1000-3673.pst.2019.0544
参考文献(References):
- [1]Mai T,Sandor D,Wiser R,et al.Renewable electricity futures study[R].NREL,US,2012.
- [2]Olek B,Wierzbowski M.Ancillary services provided by renewable energy sources[C]//IET Conference on power in unity:a whole system approach.London,UK,2013.
- [3]程世军,张粒子,李丰,等.风电场储能系统的模糊自适应控制策略[J].现代电力,2014,31(2):11-14.Cheng Shijun,Zhang Lizi,Li Feng,et al.The fuzzy adaptive control strategy of energy storage system for wind power generation[J].Modern Electric Power,2014,31(2):11-14(in Chinese).
- [4]马美婷,袁铁江,陈广宇,等.储能参与风电辅助服务综合经济效益分析[J].电网技术,2016,40(11):3362-3367.Ma Meiting,Yuan Tiejiang,Chen Guangyu,et al.Analysis on economic benefit of energy storage in auxiliary service of wind power[J].Power System Technology,2016,40(11):3362-3367(in Chinese).
- [5]胡娟,杨水丽,侯朝勇,等.规模化储能技术典型示范应用的现状分析与启示[J].电网技术,2015,39(4):879-885.Hu Juan,Yang Shuili,Hou Chaoyong,et al.Present condition analysis on typical demonstration application of large-scale energy storage technology and its enlightenment[J].Power System Technology,2015,39(4):879-885(in Chinese).
- [6]沈运帷,李扬,高赐威,等.需求响应在电力辅助服务市场中的应用[J].电力系统自动化,2017,41(22):151-161.Shen Yunwei,Li Yang,Gao Ciwei,et al.Application of demand response in ancillary service market[J].Automation of Electric Power Systems,2017,41(22):151-161(in Chinese).
- [7]Ding Zhaohao,Sarikprueck Piampoom,Lee Wei-Jen.Medium-term operation for an industrial customer considering demand-side management and risk management[J].IEEE Transactions on Industry Applications,2016,52(2):1127-1135.
- [8]陈大宇,张粒子.美国电力需求侧调频实践及其对我国的启示[J].现代电力,2015,32(5):21-26.Chen Dayu,Zhang Lizi.Frequency regulation practice at demand side in USA and its enlightenment to China[J].Modern Electric Power,2015,32(5):21-26(in Chinese).
- [9]杨铮,彭思成,廖清芬,等.面向综合能源楼宇的电动汽车辅助服务方案[J].电网技术,2017,41(9):2831-2839.Yang Zheng,Peng Sicheng,Liao Qingfen,et al.Ancillary services provided by electric vehicles for building integrated energy system[J].Power System Technology,2017,41(9):2831-2839(in Chinese).
- [10]唐哲,吴江,姚娜娜,等.考虑电网备用需求的高耗能企业鲁棒生产调度方法[J].电网技术,2016,40(7):2128-2133.Tang Zhe,Wu Jiang,Yao Nana,et al.A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve[J].Power System Technology,2016,40(7):2128-2133(in Chinese).
- [11]高赐威,李倩玉,李慧星,等.基于负荷聚合商业务的需求响应资源整合方法与运营机制[J].电力系统自动化,2013,37(17):78-86.Gao Ciwei,Li Qianyu,Li Huixing,et al.Methodology and operation mechanism of demand response resources integration based on load aggregator[J].Automation of Electric Power Systems,2013,37(17):78-86(in Chinese).
- [12]孙玲玲,高赐威,谈健,等.负荷聚合技术及其应用[J].电力系统自动化,2017,41(6):159-167.Sun Lingling,Gao Ciwei,Tan Jian,et al.Load aggregation technology and its applications[J].Automation of Electric Power Systems,2017,41(6):159-167(in Chinese).
- [13]高赐威,梁甜甜,李扬.自动需求响应的理论与实践综述[J].电网技术,2014,38(2):352-359.Gao Ciwei,Liang Tiantian,Li Yang.A survey on theory and practice of automated demand response[J].Power System Technology,2014,38(2):352-359(in Chinese).
- [14]Dielmann K,van der Velden A.Virtual power plants(VPP)-a new perspective for energy generation?[C]//Proceedings of the 9th International Scientific and Practical Conference of Students,Postgraduates Modern Techniques and Technologies.2003,MTT 2003.
- [15]Saboori H,Mohammadi M,Taghe R.Virtual power plant(vpp),definition, concept, components and types[C]//2011 Asia-Pacific Power and Energy Engineering Conference.2011.
- [16]徐辉,焦扬,蒲雷,等.计及不确定性和需求响应的风光燃储集成虚拟电厂随机调度优化模型[J].电网技术,2017,41(11):3590-3597.Xu Hui,Jiao Yang,Pu Lei,et al.Stochastic scheduling optimization model for virtual power plant of integrated wind-photovoltaic-energy storage system considering uncertainty and demand response[J].Power System Technology,2017,41(11):3590-3597(in Chinese).
- [17]卢志刚,王荟敬,赵号,等.含V2G的虚拟电厂双层逆鲁棒优化调度策略[J].电网技术,2017,41(4):1245-1252.Lu Zhigang,Wang Huijing,Zhao Hao,et al.Strategy of bi-level inverse robust optimization dispatch of virtual power plant containing V2G[J].Power System Technology,2017,41(4):1245-1252(in Chinese).
- [18]周亦洲,孙国强,黄文进,等.计及电动汽车和需求响应的多类电力市场下虚拟电厂竞标模型[J].电网技术,2017,41(6):1759-1766.Zhou Yizhou,Sun Guoqiang,Huang Wenjin,et al.Strategic bidding model for virtual power plant in different electricity markets considering electric vehicles and demand response[J].Power System Technology,2017,41(6):1759-1766(in Chinese).
- [19]张高,王旭,蒋传文,等.采用双层优化调度的虚拟电厂经济性分析[J].电网技术,2016,40(8):2295-2301.Zhang Gao,Wang Xu,Jiang Chuanwen,et al.Economic analysis of virtual power plants based on bi-level optimization dispatch[J].Power System Technology,2016,40(8):2295-2301(in Chinese).
- [20]Wu H,Shahidehpour M,Li Z,et al.Chance-constrained day-ahead scheduling in stochastic power system operation[J]. IEEE Transactions on Power Systems,2014,29(4):1583-1591.
- [21]Wang Q,Wang J,Guan Y.Stochastic unit commitment with uncertain demand response[J].IEEE Transactions on Power Systems,2013,28(1):562-563.
- [22]Fu H,Wu Z,Zhang X,et al.Contributing to DSO’s energy-reserve pool:a chance-constrained two-stageμVPP bidding strategy[J].IEEE Power and Energy Technology Systems Journal,2017,4(4):94-105.
- [23]Piette M A,Schetrit O,Kiliccote S,et al.Costs to automate demand response-taxonomy and results from field studies and programs[R].Berkeley,CA(United States):Lawrence Berkeley National Lab.(LBNL),2017.