摘要(Abstract):
大规模风电基地的快速建设,使系统调峰成为电网运行的新难题之一。针对风电出力随机性强、运行方式复杂多变的特点,通过对规划年份时序负荷曲线与风电出力时序曲线的模拟,从一个新的角度分析了大规模风电对系统调峰的影响。还讨论了风电出力对系统峰谷差的影响机理,并引入评价指标体系,深入研究了大规模风电基地接入后系统等效负荷峰谷差的变化及分布规律。进一步分析了在各种外送模式以及系统调峰协调方式下,大规模风电基地对系统调峰的影响规律。以我国甘肃酒泉风电基地为对象进行分析和论证,并根据分析结果对甘肃电源规划与调度运行方式提出了建议。
关键词(KeyWords): 风力发电;调峰;时序负荷曲线;风电出力时序曲线;负荷谷峰差
基金项目(Foundation): 国家自然科学基金资助项目(50877041);; 新世纪优秀人才支持计划项目(NCET-07-0484)~~
作者(Author): 张宁;周天睿;段长刚;唐晓军;黄建军;卢湛;康重庆;
Email:
DOI: 10.13335/j.1000-3673.pst.2010.01.012
参考文献(References):
- [1]Ronan D,Eleanor D,Mark O'.System operation with a significant wind power penetration[C].IEEE Power Engineering Society General Meeting,Denver,2004.
- [2]Holttinen H.The impact of large scale wind farm integration in nordic countries[D].Espoo,Finland:Helsinki University,2004.
- [3]Holttinen H.Hourly wind power variations in the Nordic countries[J].Wind Energy,2005,8(2):173-195.
- [4]Ronan D,Mark O.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Trans on Power Systems,2005,20(2):587-595.
- [5]孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,29(4),2009:41-47(in Chinese).
- [6]李强,袁越,李振杰,等.考虑峰谷电价的风电-抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18.li Qiang,Yuan Yue,Li Zhenjie,et al.Research on energy shifting benefits of hybrid wind power and pumped hydro storage system considering peak-valley electricity price[J].Power System Technology,2009,33(6):13-18(in Chinese).
- [7]雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2007,27(8):84-89(in Chinese).
- [8]戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.Dai Huizhu,Wang Weisheng,Chi Yongning.Recent wind power integration study in China[J].Power System Technology,2007,31(20):16-23(in Chinese).
- [9]Holttinen H.Impact of hourly wind power variations on system operation in the Nordic countries[J].Wind Energy,2005,8(2):197-218.
- [10]Goran M,Davor B.Impact of wind power plants on power system operation in Croatia[C].International Conference on clean Electrical Power,Gapri,2007.
- [11]Eriksen P B,Ackermann T,Abildgaard H,et al.System operation with high wind penetration[J].IEEE Power and Energy Magazine,2005,3(6):65-74.
- [12]Hadi B,Luo Changling,Boon T O.Impacts of wind power minute-to-minute variations on power system operation[J].IEEE Trans on Power Systems,2008,23(1):150-160.
- [13]中国电力工程顾问集团西北电力设计院.甘肃洒泉风电基地输电规划[R].西安:中国电力工程顾问集团西北电力设计院,2008.
- [14]Zhang Ning,Kang Chongqing,Duan Changgang,et al.Simulation methodology of multiple wind farms operation considering wind speed correlation[C].The Third IASTED Asian Conference on Power and Energy Systems,Beijing,2009.