基于层次分析法的购电方案模糊综合评价探讨RESEARCH ON FUZZY COMPREHENSIVE EVALUATION OF ELECTRIC ENERGY PURCHASING SCHEME BASED ON ANALYTIC HIERARCHY PROCESS
田玲
摘要(Abstract):
随着电力市场化改革的不断深入,供电企业为了提高自身竞争力,就必须在保证电网运行可靠性的前提下兼顾经济性。对于拥有多电源、分区域供电电网的供电企业,合理地选择电力供给方和优选购电方案是降低企业综合运营成本、提高电网运行经济性的有效途径之一。作者综合考虑电力供给方的综合电费、辅助服务、综合服务和供电企业自身的电网结构、输电成本等因素,将模糊综合评价、层次分析和专家决策相结合,通过定性分析和定量计算,综合评价各购电方案,合理选择电力供给方,从而减少输电总费用,确保电网可靠、经济运行。该思路已应用于华北油田大型电网,并取得了一定的经济效益。
关键词(KeyWords): 电力市场;供电企业;可靠性;经济性;模糊综合评价;层次分析法
基金项目(Foundation):
作者(Author): 田玲
Email:
DOI:
参考文献(References):
- [1]于会萍,刘继东,程浩忠,等.电网规划方案的成本效益分析与评价研究[J].电网技术,2001,25(7):32-35.Yu Huiping,Liu Jidong,Cheng Haozhong et al.Cost-benefit analysis and evaluation of power network planning[J].Power System Technology,2001,25(7):32-35.
- [2]赵儆,康重庆,胡左浩,等.电力市场中效用风险指标及其决策模型的研究[J].电力系统自动化,2004,28(10):49-53.Zhao Jing,Kang Chongqing,Hu Zuohao et al.Research on utility risk index and its applications in electricity market trade model[J].Automation of electric power systems,2004,28(10):49-53.
- [3]郭金,江伟,谭忠富.风险条件下供电公司最优购电问题研究[J].电网技术,2004,28(11):18-22.Guo Jin,Jiang W,Tan Zhongfu.Research on optimized power purchasing of power suppliers under risk condition[J].Power System Technology,2004,28(11):18-22.
- [4]刘亚安,管晓宏.电力市场中购电商的市场分配问题研究[J].中国电机工程学报,2001,21(10):20-23.Liu Ya’an,Guan Xiaohong.Market allocation problem for energy demander in power market[J].Proceedings of the CSEE,2001,21(10):20-23.
- [5]刘亚安,管晓宏,薛禹胜.Price-taker在两个电力市场中的交易决策[J].电力系统自动化,2004,25(8):13-15..Liu Ya’an,Guan Xiaohong,Xue Yusheng.Trade decision of Price-taker in dual electric power markets[J]..Automation of electric power systems,2004,25(8):13-15.
- [6]刘亚安,管晓宏.考虑风险因素的两市场购电优化分配问题[J].电力系统自动化,2002,26(9):41-44,48.Liu Ya’an,Guan Xiaohong.Optimization of purchase allocation in dual electric power markets with risk management[J].Automation of electric power systems,2002,26(9):41-44,48.
- [7]蒋哓荣,刘军,李小彬.京津唐电网按网电费用经济调度方案的分析论证[J].电网技术,2000,24(12):24-26.Jiang Xiaprong,Liu Jun,Li Xiaobin.Analysis of commitment strategy for Beijing-Tianjin-Tangshan power network according to power purchasing cost[J].Power System Technology,2000,24(12):24-26.
- [8]韩水,汪定伟.基于多代理技术的购电—输电计划优化方法[J].电力系统自动化,2002,26(13):43-46.Han Shui,Wang Dingwei.Optimization approach for power purchase and distribution based on multi-agent system[J].Automation of electric power systems,2002,26(13):43-46.
- [9]谢开,于尔铿,宋永华,等.电力市场中的输电服务(一)[J].电网技术,1997,21(3):63-68.Xie Kai,Yu Erkeng,Song Yonghua et al.Transmission services inelectricity market—basic theory and accomplishment[J].Power System Technology,1997,21(3):63-68.
- [10]谢开,于尔铿,宋永华,等.电力市场中的输电服务(二)[J].电网技术,1997,21(4):58-63.Xie Kai,Yu Erkeng,Song Yonghua et al.Transmission services in electricity market—ancillary services supplying and pricing[J].Power System Technology,1997,21(4):58-63.
- [11]谢开,于尔铿,宋永华,等.电力市场中的输电服务(三)[J].电网技术,1997,21(5):62-66.Xie Kai,Yu Erkeng,Song Yonghua et al.Transmission services in electricity market—reactive power management and pricing[J].Power System Technology,1997,21(4):62-66.
- [12]汪培庄,韩立岩.应用模糊数学[M].北京:北京经济学院出版社,1989.
- [13]吴育华,付永进.决策、对策与冲突分析[M].海口:南方出版社,2001.